What should a written construction estimate include?
https://dthconnections.com/how-to-choose-an-office-renovation-contractor-in-albany-ny/
Exclusions, contingency named as a number, allowances with their basis, a schedule showing permit review separately, and long-lead items identified. The exclusions are where quotes actually diverge.